top of page

Shaanxi Rural Area - Project Case (Domestic)

Project type

Shaanxi rural domestic sewage treatment project

Installation time

September 2022, October 2023

Condition of service

The geothermal height difference in northern Shaanxi has obvious advantages, which requires the treatment equipment that can adapt to the terrain conditions and the fluctuation characteristics of rural water quality, and does not need the daily personnel operation and maintenance. 
According to the treatment requirements, the project selects BioFilter-500, BioFilter-1000, BioFilter-10000 and other different types of equipment to collect and treat the domestic sewage generated by residents on a daily basis. The project is installed by a third party, and the daily operation is extremely simple. 
After the operation of the project, the local regulatory authorities designated the testing institutions to regularly test and supervise the water outlet, and the water outlet continued to reach the standard, which was highly praised by the local residents.

image.png
bottom of page